SECTION 001113 ADVERTISEMENT FOR BIDS FROM: 1.01 CONSTRUCTION MANAGER (HEREINAFTER REFFRED TO AS BARTON MALOW BUILDERS): A. Address: 26500 American Drive Southfield, MI 48034 1.02 AND THE OWNER (HEREINAFTER REFERRED TO AS MEMPHIS COMMUNITY SCHOOLS): A. Address 34110 Bordman Rd. Memphis, MI 48041 1.03 DATE: April 7, 2026 1.04 TO: POTENTIAL BIDDERS A. Barton Malow Builders requests proposals on behalf of Owner for the construction of Memphis Community Schools BP4T Athletic Fields Technology. Proposals will be received: 1. Via Building Connected, link below, by April 29, 2026 at 2:00pm EST 2. Questions via E-mail to jeff.zalucha@bartonmalow.com or through the messages tab on Building Connected 3. Link to the documents: https://app.buildingconnected.com/projects/69d546547854195fb499a351/bid-packages B. Proposals shall be based on the requirements set forth in the bid documents prepared by Barton Malow Technology Design dated April 7, 2026 for: 1. Bid Category: 271500 Structured Cabling Systems 2. Bid Category: 274119 Multipurpose AV Systems C. Bidding Documents can be viewed on Building Connected (link above). Request for access to Building Connected documents can be sent to jeff.zalucha@bartonmalow.com D. Accepted Bidder will be required, as a condition precedent to award of contract, to furnish, satisfactory Performance Bond and Payment Bond and Certificates of Insurance as required in the Project Manual. E. Project is subject to state sales and/or use taxes and bidder is required to include such taxes in its bid proposal. F. Project is subject to prevailing wage rates G. Barton Malow Builders, has been contracted by the Owner in the capacity of Construction Manager for the project, and shall act as representative of the Owner to the extent required/allowed under its Owner contract. H. No pre-bid conference is planned, potential bidders can reach out to schedule individual site walks if they want to see the field area. I. Barton Malow Builders Project Number: 250072 J. Bidders will be required to be pre-qualified with Barton Malow Builders prior to contract award. Bidders do not need to be pre-qualified to submit a bid. Qualification requirements will be shared with the awarded bidder, if they are not already pre-qualified, prior to signed contracts. K. Bid Proposals, once submitted, shall be valid for 60 days after submitted date. L. Bidders will be required to submit with their Bid Proposals, Bid Security, in the amount of 5% of base bid, by a qualified surety authorized to do business in the state where the project is located. M. Bidders with an Experience Modification Rate (EMR) greater than 1.0 may not be considered for contract award. N. The successful bidder will be required to enter into a contract with Memphis Community Schools on the AIA Document A132-2019 Standard Form of Agreement between Owner and Contractor, Construction Manager as Advisor Edition. O. All payments will be processed and paid through Textura/Oracle systems. P. The Owner reserves the right to accept or reject any or all offers. 1.05 TENTATIVE PROJECT SCHEDULE A. Bids released April 8, 2026 B. Question Deadline April 20, 2026 C. Addendum Issued April 21, 2026 D. Bids Due April 29, 2026 E. Post Bid Interviews Week of May 1, 2026 F. Board Approval May 18, 2026 G. Startup Documents Due June 5, 2026 H. Project Completion August 14, 2026 END OF SECTION
